The completed elevated deck at dusk: composite decking and stair treads, black aluminium railing, white PVC fascia and framed lattice skirt, with warm light from the house windows behind.
NS-26-001 — NASHUA, NH — COMPLETED 07.2026

Custom Deck Build

PROJECT
NS-26-001
LOCATION
NASHUA, NH
SCOPE
CUSTOM DECK BUILD — OUTDOOR STRUCTURE
AREA
±450 SF INCL. STAIRS
YEAR
2026
STATUS
COMPLETED — 07.2026

A substantial outdoor living project designed around clean structure, generous usable space and long-term durability.

The project involved the full construction of a new elevated deck, including foundation work, structural framing, decking, stairs, railings and finished details. The build required careful sequencing across excavation, concrete, framing and finish work, with multiple trades and helpers coordinated throughout the project.

The result is a large, highly functional outdoor space that feels integrated with the home rather than added onto it.

For Northeast Standard, the project represents the kind of work the brand is built around: substantial residential construction, carefully executed from structure through finish.

PH-01

Existing conditions

The original deck before demolition, weathered boards with patio furniture still in place against the house.
ORIGINAL DECK — SURVEYED 05.2026
Side approach to the original deck showing the aging white railing and the stair run down to grade.
STAIR & SKIRT — PRE-DEMOLITION
The existing stair run seen from grade, dark treads and white balusters, later removed in full.
EXISTING STAIR RUN — REMOVED TO GRADE 06.2026
The original lattice skirt enclosing the under-deck space along the length of the structure.
ORIGINAL SKIRT — VENTILATION RETAINED IN THE REBUILD
Grade conditions beside the house: mulch bed, condenser unit and utility penetrations that set the excavation clearances.
GRADE CONDITIONS — MECHANICAL CLEARANCES SET BEFORE EXCAVATION
The original deck field photographed from above, showing the old board run and the door threshold it met.
DECK FIELD FROM ABOVE — ORIGINAL BOARD RUN
PH-02

Structure

Underside of the new frame: treated 6x6 posts seated on poured concrete footings with galvanised post-base anchors.
BEARING — 6×6 SYP ON POURED FOOTINGS, ABA66Z ANCHORS
The completed joist frame with flashing tape over every joist top and rail posts standing ready for decking.
FRAME — 2×10 SYP @ 16" O.C., LUS210Z HANGERS, JOISTS TAPED
Doubled 2x12 stair stringers running from the deck frame to grade, with composite decking stacked on site alongside.
STAIR STRINGERS — DOUBLED 2×12 — DECKING STAGED ON SITE
PH-03

Finish

A framed lattice skirt panel being fabricated on site below the completed black rail line.
SKIRT PANELS — FABRICATED AND FIT ON SITE
The finished stair assembly in daylight: composite treads, white PVC risers, black posts and aluminium balusters.
STAIR ASSEMBLY — COMPOSITE TREAD, PVC RISER, ALUM. BALUSTER
The completed stair run rising from the new poured concrete landing pad to the deck field.
STAIR RUN FROM GRADE — POURED LANDING PAD
The finished stairs and railing photographed in evening light, lattice skirt closing the under-deck space.
STAIR ASSEMBLY — EVENING, 07.2026
PH-04

Detail

Close detail of the deck surface: grooved composite boards with no visible fasteners, shadow lines cast by the black balusters.
FIELD — TREX BISCAYNE 5/4×6 GROOVED, HIDDEN-CLIP FASTENED, NO FACE SCREWS
SCH-A

Material & assembly schedule

RefElementSpecificationStatus
ST-01FrameTREATED SYP #1 — 2×10 JOISTS, LUS210Z HANGERS, FLASHING-TAPEDINSTALLED
ST-02Bearing6×6 SYP POSTS — ABA66Z ANCHORS ON POURED CONCRETE FOOTINGSINSTALLED
DK-01DeckingTREX BISCAYNE 5/4×6 GROOVED — HIDDEN CLIP FASTENEDINSTALLED
DK-02StairsDOUBLED 2×12 STRINGERS — COMPOSITE TREAD, PVC RISERINSTALLED
RL-01RailBLACK ALUM. BALUSTERS — POST SLEEVES & CAPS, COMPOSITE CAP RAILINSTALLED
TR-01TrimAZEK PVC 1×12 / 1×8 / 1×4 — CORTEX CONCEALED FASTENINGINSTALLED
SK-01SkirtVINYL PRIVACY LATTICE — SITE-FRAMED PANELSINSTALLED
CN-01LandingPOURED CONCRETE PAD AT STAIR BASEINSTALLED

The governing constraint was sequence rather than span. Excavation and concrete had to clear before framing could start, and the composite surface, rail system and PVC trim each arrived as separate packages that had to land in order. The schedule was built backwards from that constraint.

NORTHEAST STANDARD
PROJECT
NS-26-001
LOCATION
NASHUA, NH
SCOPE
CUSTOM DECK BUILD
STATUS
COMPLETED — 07.2026

RECORD CLOSED.
THE STAMP CLOSES THINGS. IT NEVER OPENS THEM.